Cairn Energy, India

A turn-key solution

In December 2007 two Multiphase Pumps were started successfully at on Oil Terminal on the east cost of India.

In oder to overcome the high backpressure of the pipeline which constraints productivity of the well at offshore, the Multiphase Pumps were installed at the onshore terminal.

The skids consist of all necessary control and safety equipment suitable to handle the well fluid with appropriate operational flexibility and supervisory.

The installed Multiphase Pumps boost varying fluid regimes, as the pipeline is handling multiphase (oil, gas, water) flow and slug flow (gas).